Skip to content
City of Aspen Engineering Logo
  • Overview
  • Introduction
    • What is a CMP?
    • Why do we require a CMP?
    • CMP Enforcement Policy
  • Paperwork
    • Paperwork
    • Disturbance Area and Vicinity Map
    • Project Description, Permit List, Contact List
    • Public Notification and Signage
    • Dates and Hours of Construction
    • CRA/Core
    • Adjoining Properties
    • Project Fencing
    • Tree Permit
    • Section 2 Review
  • Site and ROW
    • Site and Right of Way Management
    • Site Plan
    • Earth Stabilization
    • ROW Management
    • Section 3 Review
  • Noise Suppression
    • Noise Suppression
    • Noise Limits and Measurements
    • Noise Monitoring
    • Continued Noise Regulations
    • Noise Suppression Plan
    • Noise Suppression Barrier Screening
    • Section 4 Review
  • Additional Requirements
  • Course Review
  • Final Exam
Click Here to Continue

SITE AND RIGHT OF WAY (ROW)
MANAGEMENT

In this section we will go over all the drawings that will be part of a CMP. This generally corresponds to sections 5,6 and 7 of the CMP Manual.

All drawings should be clearly legible and have adequately sized aerial views. Include all CMP drawings with the CMP submittal. Do not simply reference drawings in the larger plan set.

Section 3 – Site and Right of Way Managementavick2018-11-05T23:29:31+00:00
https://cmpaspen.com/wp-content/uploads/2018/11/Section-3-intro_merge.mp3

City of Aspen

130 S. Galena Street Aspen, CO 81611

Phone: 970.920.5000

Email: Email for Info

Copyright City of Aspen Engineering  |  All Rights Reserved  |  Powered by Vick+Co
Facebook