5.1 A Temporary ROW Encroachment is necessary any time a street, alley, or sidewalk will be blocked during construction, even if only for a delivery.
Show full extent of encroachment with exact measurements.
6.0 Include a Traffic Control Plan outlining how pedestrian and vehicle traffic will be routed during the encroachment.
Right of Way Management